4. Operation
4-1. Inspection before starting
Upon completing installation, check the following prior to operation:
- ・Correct rotation specifications
- ・Secure connection to the driven shaft
- ・No loose mountings or bolts
- ・After completing installation, supply grease using the grease nipple before starting operation.
4-2. Test run
Before running in production, run the reducer without a load. Check for any problems in the rotation specifications and any vibration, noise, or heat generation. Gradually increase the load.
4-3. Production run
After starting operation, inspect the following items.
- ・Unusual vibration, noise, heat generation, etc.
- ・Impact or excessive load on the gear box.
Note) The gear box may generate heat during the first two or three days of operation.
However, if the case surface temperature exceeds 93°C, it could indicate an incorrect oil level or improper installation. Check each part.